Sunday, March 11, 2012

Upgrade time :)

Upgrades were the reason we did this project. The old bathroom lacked a lot of modern conveniences and necessities. First up, Brandon added a bath fan that has a light as well. This will help get the moisture out of the room faster, thus decreasing the mold/mildew likelihood. The fan has to be vented to the outside, so he added a vent through the soffet.



Electrical work..with the new bath fan and recessed can light over the bath tub, Brandon upgraded the wiring and added a pretty cool switch with 4 switches. Lots of options!!
Last but not least, we got rid of the shower and put in a whirlpool bathtub. These require their own dedicated circuit with GFCI outlet. We had space in the new circuit breaker we got last summer so this was relatively easy. Still impressed it works :)

No comments:

Post a Comment